CIMS论文的天地

 

制造业中产品全生命周期成本的研究概况综述

注意:本论文已经在《机械工程学报》(中文版)(200238(11):17-25)杂志发表
使用者请注明论文内容出处

陈晓川 方明伦
(上海大学CIMS & 机器人中心 上海 200072 )

摘要:对全生命周期成本(LCC)的内涵、构成和估算方法进行了详细的介绍,并综述了国内外LCC分析在产品设计、价值工程、设备管理等方面的应用及其研究现状,并针对我国的实际情况,指出除了军事方面进行深入研究和应用LCC方法外,更应该加强对民用产品方面的应用,并提出在我国亟待开展的全生命周期成本问题研究重点和途径有:LCC标准的制定、面向成本的设计方法和价值工程、LCC数据收集等。
叙词:全生命周期成本/寿命周期费用 面向成本的设计 价值工程
中图分类号: TH122 F403.7

SUMMARIES OF PRODUCT LIFE CYCLE COST IN MANUFACTURING
Chen-xiaochuan, Fang-minglun
(CIMS & Robotics Center, Shanghai University, Shanghai, China)

Abstract: The concept, composition and estimation of life cycle cost (LCC) were profoundly studied and presented in detail. Then the state-of-the-art of applications of LCC analysis home and abroad to product design, value engineering(VE), equipment management and so on is also comprehensively summarized. And according to the practical situations in China, LCC analysis was proposed to be not only used in military applications but also especially in civilian applications. Finally, the hot point of LCC research work and approaches in China should be as follows: LCC’s normal establishment, Design For Cost (DFC) and VE, LCC data collection, etc. 
Key words: Life cycle cost Design for cost Value engineering

1浏览PDF格式全文需要使用软件--Abode Acrobat(由于软件较大并常见,我站不提供下载)

2下载论文全文请点击鼠标右键“另存为”或使用网络蚂蚁下载(53KB)

0 前言

    产品成本是反映企业生产、经营和管理水平的一项综合性指标,企业的劳动生产率、材料、能源利用情况、机器设备使用效果、产品质量高低等,都会直接或间接地通过成本指标得到反映。产品成本数据在企业的各项决策中也起着重要的作用,如:快速报价、产品定价、设计评价、产品盈利能力分析和后勤管理等。一些资深的企业毫不隐蔽地把企业管理的诀窍,归结于成本管理[1]。郑辉等通过对合作企业的调查也发现,成本计划制定和成本分析是加强企业管理的关键步骤[2]。
通过对产品成本相关问题的研究,降低产品成本就意味着节约生产过程中的人力、财力和物力消耗,生产出更多、更好的产品。本文通过对全生命周期成本的内涵、构成和估算方法进行了详细的介绍,综述了LCC(Life Cycle Cost)分析在产品设计、价值工程、设备管理等方面的应用及其研究现状,并针对我国的实际情况,提出了我国亟待开展的全生命周期成本问题研究重点和方向。需要特别指出的是全生命周期成本的应用比较广泛,如在汽车、环保、建筑、投资等方面都有应用,本文的研究内容主要为制造业中的情况。
1 全生命周期成本的定义和构成
1.1 全生命周期成本的概念
“成本”这一概念在不同的学科中有不同的解释,即使在同一学科的不同分支也有不同的解释,例如:在成本会计中的定义为:成本是指企业生产经营过程中各种经济资源价值牺牲进行对象化计算的数额[3]。全生命周期成本(LCC)也被称为寿命周期费用。对于LCC这种研究观念,早在1950年美国对可靠性的研究过程中就已有萌芽[4]。1962年在美国国防部长的报告中披露:1961年美国国防预算至少25%用在维修费上,并且得出结论认为把全部寿命周期内的维护费压缩到最低才是产品研制的基本思想。1966年6月美国国防部(DoD)开始正式研究LCC[5],并在1970年开始使用LCC评价法[6],即LCC的概念最早是由美国国防部提出并使用的。文献[7]指出在一个典型的武器系统中运行和维护的成本占总成本的75%,在文献[8]中指出如果武器系统的成本按照当时的增加趋势,那么在2045年美国的全年国防预算只能购买1架战斗机。从中我们可以发现DoD对LCC的研究是迫不得已的。
DoD给出的LCC的定义为:政府为了设置和获得系统以及系统一生所消耗的总费用,其中包括开发、设置、使用、后勤支援和报废等费用[9]。本文认为LCC是指产品从开始酝酿,经过论证、研究、设计、发展、生产、使用一直到最后报废的整个生命周期内所耗费的研究、设计与发展费用、生产费用、使用和保障费用及最后废弃费用的总和[10],[11]。虽然LCC方法首先是在军事领域进行的应用,但随着LCC方法在军事领域的成功应用,在民用领域也逐步得到了应用,其应用领域日益扩大。
1.2 全生命周期成本的构成 <以下省略,观看全文请下载>


4 结论

    当前我国的市场经济刚刚起步,就面临加入WTO后激烈的全球竞争,建立降低成本的新思路和方法,对于有效进行价格竞争,提高企业的竞争能力和经济效益都有重大的现实意义,采用LCC方法是必然选择。
LCC方法是一种以提高企业经营的经济性和确保用户利益为目标的决策方法,这一方法在美国和日本等国进入实用化到目前也不过是30多年的时间。LCC最早是在军事领域进行的应用,我国也不例外,但随着市场竞争的日益激烈,更应该加强对民用产品方面的应用。LCC方法符合可持续发展战略、先进制造哲理、以顾客为中心思想的要求,制造业在自动化、网络化、智能化、学科交叉中迅猛发展的今天,我们一定要在产品设计中开展LCC研究,加强LCC数据的收集与整理,为LCC方法在我国的广泛应用努力工作。

参考文献

1 李荐名.现代制造业的成本技术.机械制造,2001,39(4):79
2
郑辉,贾春福,袁晓洁等.制造型企业成本分析原型系统设计与实现.计算机集成制造系统,20017(1):6468
3
中国注册会计师教材编审委员会.成本管理会计.北京:中国人民大学出版社,1995.
4
肖保生.设备管理系统.西安:西北工业大学出版社,1997.
5 [
]市田 崇.维修性与维修后勤保障.北京:机械工业出版社,1988.
6 [
]日比宗平.高克勣等译.寿命周期评价法――方法及实例.北京:机械工业出版社,1988.
7 Gupta Y. P. Life cycle cost models and associated uncertainties. In: J. K. Skwirzynski(ed.) Electronics Systems Effectiveness and Life Cycle Costing, NATO ASI Series ,Vol. F. 1983.535
549
8 Dean E B, Unal R. Elements of designing for cost. In: Proceedings of AIAA 1992 Aerospace Design Conference, February, 1992, Irvine,CA.
9
廖祖仁,傅崇伦.产品寿命周期费用评价法.北京:国防工业出版社,1993.
10
阮镰,章国栋.工程系统的规划与设计.北京:北京航空航天大学出版社,1991.
11 [
美国]Booz Allen, Hamilton Ine..王若松,章国栋,阮镰.郁士光译.美国系统工程管理.北京:北京航空航天大学出版社,1991.
12 Fabrycky W J, Blanchard W J. Life-cycle cost and economic analysis. Englewood Cliffs, NJ: Prentice Hall, 1991.
13
吴少平.产品设计成本系统优化导论.北京:地震出版社,1994.
14
董仲元,蒋克铸.设计方法学.北京:高等教育出版社,1991.
15 Alting L. Life-cycle design of products: a new opportunity for manufacturing enterprises, Concurrent Engineering: Automation , Tools, and Techniques, A. Kusiak(ed.), New York:Wiley , 1993,1
17
16
邢继昌,吴江.论产品生命周期成本.财税与会计,2000,3:1718
17
杜军,顾培亮,焦媛媛.面向企业信息集成的全面成本管理.中国机械工程,200112(2):175178
18
张暴暴.制造产品报价及其智能集成系统研究:[博士学位论文].大连:大连理工大学,1999.
19
陈晓川,刘晓冰,冯辛安.面向成本的设计中的成本构成及其估算框架的研究.中国机械工程,2001,12(5):510514
20
陈晓川.并行工程中面向成本的设计的理论与方法研究:[博士学位论文].大连:大连理工大学,2000.
21 W J Kolarik. Life cycle costing and associated models. Proceedings of the American Institute of Industrial Engineers 1980 Spring Annual Conference, 58
64
22 Greenwood T G, Reeve J M. Activity-based cost management for continuous improvement: a process design framework. Cost Management.1992, Winter:22
40
23 OH C J, Park C S. An economic evaluation model for product design decisions under concurrent engineering. The Engineering Economist. 1993,38(4):275
296
24 Ong N S. Manufacturing cost estimation for PCB assembly: an activity based approach. International Journal of Production Economics. 1995,68(38):159
172
25
张魁元,刘长泰,杨印生.系统寿命周期费用与有效度的优化模型.吉林工业大学学报(自然科学版)199727(3):4448
26 J M Daschbach, Henry Apgar. Design analysis through techniques of parametric cost estimation, Engineering costs and Production Economics,1988,12(14):87
93
27 Creese R C, Moore L T. Cost modeling for concurrent engineering, Cost Engineering,1990,32(6):23
27
28 Pugh S. Manufacturing cost information – the needs of the engineering designer. In: Proceedings of the Conference Information System for Designers, Southampton, UK, Paper12:1
8
29 Boothroyd G, Dewhurst P. Design for assembly selecting the right method. Machine Design. 1983,10(11):94
98
30 Weirda L S. Product cost-estimation by the designer. Engineering Costs and Production Ecomonics.1988,12(13):189
198
31
罗辉.实用产品设计经济分析――产品设计经济学.北京:机械工业出版社,1994.
32
胡树华,李必强.论产品成本设计.机械设计与研究,1998,15(2):1922
33
冯广平.基于产品寿命周期成本的设计方法研究.家用电器科技,2000(9):7375
34
冯厚植,平申.工程设计方法导论.北京:航空工业出版社,1988.
35
傅家骥.价值分析在产品设计中的应用.北京:机械工业出版社,1986.
36
张文泉,李泓泽,何文秀等.价值设计与寿命周期成本.价值工程,1999,13(2):2223
37 Michaels J V, W P Wood. Design To Cost. John Wiley & Sons, New York NY. ,1989.
38 Earles D R. Design to operation and support costs. In: Proceedings of the 1974 Annual Reliability and Maintainability Symposium.1974,149
153
39 Caver T V. Life cycle cost: attitudes and latitudes. Defense Management Journal, 1979,15(7-8):12
17
[40]
陈晓川,张暴暴,冯辛安.面向成本的设计的关键技术及其概念模型.大连理工大学学报,199939(6)775780
[41]
陈晓川,刘晓冰,张暴暴等.面向并行工程的DFCDTC辨析.机械科学与技术,200019(4):645647
42 Shia, Yoshiaki. Maintenance integration in advanced equipment management at Nippon steel and its results. South East Asia Iron and Steel Institute, 1998,27(1):35
47
43 Walker, Ray M. Automated systems life cycle management & economics. In: Proceedings of the 1997 ISA TECH/EXPO Technology Update. Part 1/2 (of 5). Anaheim, CA, USA,1997,p77
81
44
赵涛,朱永宏,李银惠.论日本企业全员生产维护管理制度.工业工程,2000,3(3):1416
45
梁工谦,朱振中.数控设备的寿命周期费用分析.机械科学与技术,200019(4):617618
46
陈淑华.设备寿命周期费用的最优化.石油机械,199927(10):4243
47 (
)J 莫布雷.石磊,谷宁昌译. 以可靠性为中心的维修. 北京:机械工业出版社,1995.
48 Renforth, Lee. Economic case for Reliability Centred Maintenance in the UK - a pilot study. In: Proceedings of the 1998 IEE Colloquium on Distribution Overhead Lines- Economics, Practice and Technology of Reliability Assessment. Conference Location: London, UK, 1998. IEE Colloquium (Digest) n 289 1998. IEE, Stevenage, Engl. 5p
49
可靠性与维修性分析软件Relexhttp://www.relexsoftware.com
50
朱蓓玲.对寿命周期成本思想和维修理论的探讨.国外铁道车辆,1999,36(4):14
51 K K Govil. New analytical models for logistics support cost and life cycle cost vs reliability function. Microelection Reliability. 1984, 24(1):61
63
52
于丹.超越梦想 关爱人类.大众汽车,1999,8: 67
53 Marx, William J.; Mavris, Dimitri N.; Schrage, Daniel P.Cost/time analysis for theoretical aircraft production. Journal of Aircraft,1998,35(4):637
646
54
徐磊.小组机械冷藏车的发展前景.铁道车辆,1997,35(5):2630
55
许迎杰,管春玲.新时速摆式动车组寿命周期成本技术和维修性设计的应用.铁道车辆,2000,38(7):1013
56
李福贤,赵鹏.应用价值工程实现必要功能与寿命周期成本最佳匹配.家用电器科技,2000,6:5860
57 Anon. Shared-actuator manifold minimizes costs. Journal of Petroleum Technology, 1998,50(8):60
61
58
吴正勇.军用飞机综合后勤保障工程的应用.中国机械工程, 1998, 9(12):1518
59 Benjamin S Blanchard. Life cycle costing-A review. Terotechnica, 1979,1(1):9
15


此文被引用的不完全统计情况:

1.李荐名.我国制造业成本设计的理论与方法研究综述[J]机械工程学报, 2005,(07).
2.朱朝晖.产品生命周期成本的演进及其对成本管理的启示[J]商业经济与管理 ,2005,(07)

作者点评:
   
本文对全生命周期成本的来历和应用做了较为详细的论述,提出了我国发展LCC的方向。2003年1月11日。


本站收录的本文作者的其他论文:

1、并行工程的研究概况综述

2、面向成本的设计的关键技术及其概念模型

3、面向并行工程的DFC与DTC辨析

4、基于作业成本法的DFC成本计算模式

5、面向成本的设计中全生命周期成本数据的收集、处理与使用

6、我国虚拟制造技术发展策略浅析

 更多相关论文请点击本站的<<<站内全文搜索>>>查找

欢迎您参加讨论,发表您对此论文及其研究领域的看法!
(请在发言时在标题中使用所点评的论文的题目或研究方向,这样方便大家浏览!)

返回首页 | CIMS论文 | 并行工程 | 虚拟制造 | 敏捷制造 | 其他论文 | 项目开发 | 学术资源 | 站内全文搜索 | 免费论文网站大全 |

line.gif (4535 字节)

为了更好的为大家服务,欢迎您参加本站的投票调查

>>>>参加更多投票调查请点击!

本站永久域名:http://www.cimspaper.com欢迎访问

注意:本站内容未经书面允许不得转载

All rights reserved, all contents copyright 2000-2019
本站自2000年3月总网页访问量为